Jensen @ Harrods 2012
Bruus Design were asked to design and prepare another retail presentation to the Buying Team and Project Manager at Harrods detailing all aspects, including material specs and graphic proposals. The presentation window was just a matter of a few days from briefing and dealing directly with Harrrods, Bruus Design gained approval (including specification of all class 1 fire rated materials) for Jensen to proceed with installation. Budget and time restrictions entailed utilisation of some cbd products fabrication but with the directive to differentiate with other concessions on the retail floor.